How about the panel orders? Any word on these? Mike --- In motm@y..., "J. Larry Hendry" <jlarryh@i...> wrote: > I dropped of 1/2 the flat rails and 1/2 the SKB backs at the powdercoat > place today. The good news is that instead of the normal 3 week wait, I was > told he would have these done next week. > > So, SKB backs and some of the rails will be shipping next week. Flat rails > guys expect invoices this weekend. > > Why only 1/2 the SKB backs? Because the metal shop missed the spec by > 30/1000 inch width on 1/2 of them. That doesn't sound like a lot on such a > low tech item. But, it was more than enough to keep the tops from fitting. > Sigh.... So, I am waiting for that 1/2 to be re-done. The good news is > that all the tops are OK and I have plenty of 10U backs in the "good" half > to fill all the orders. The bad news is that ALL of the 5U tall backs were > wrong. I was promised they would have those replacements made right away. > We'll see what "right away" means. > > Why only 1/2 the flat rails. Because Aaron's backordered 2500 of my screws > that I use to keep the powdercoat off the threads. I was told the > backordered screws would be shipped today. So next week, the remaining 1/2 > (of hopefully everything) goes in to powdercoat. Given the unusually speedy > response I am getting from the powdercoat place, looks like all flat rails > and SKB backs should be at their destinations before Turkey-day. > > Larry
Message
Re: good news
2002-11-03 by Mike Marsh
Attachments
- No local attachments were found for this message.