good news

good news

2002-11-02 by J. Larry Hendry

I dropped of 1/2 the flat rails and 1/2 the SKB backs at the powdercoat
place today.  The good news is that instead of the normal 3 week wait, I was
told he would have these done next week.

So, SKB backs and some of the rails will be shipping next week.  Flat rails
guys expect invoices this weekend.

Why only 1/2 the SKB backs?  Because the metal shop missed the spec by
30/1000 inch width on 1/2 of them.  That doesn't sound like a lot on such a
low tech item.  But, it was more than enough to keep the tops from fitting.
Sigh....  So, I am waiting for that 1/2 to be re-done.  The good news is
that all the tops are OK and I have plenty of 10U backs in the "good" half
to fill all the orders.  The bad news is that ALL of the 5U tall backs were
wrong.  I was promised they would have those replacements made right away.
We'll see what "right away" means.

Why only 1/2 the flat rails.  Because Aaron's backordered 2500 of my screws
that I use to keep the powdercoat off the threads.  I was told the
backordered screws would be shipped today.  So next week, the remaining 1/2
(of hopefully everything) goes in to powdercoat.  Given the unusually speedy
response I am getting from the powdercoat place, looks like all flat rails
and SKB backs should be at their destinations before Turkey-day.

Larry

Re: good news

2002-11-03 by Mike Marsh

How about the panel orders?  Any word on these?

Mike

--- In motm@y..., "J. Larry Hendry" <jlarryh@i...> wrote:
> I dropped of 1/2 the flat rails and 1/2 the SKB backs at the 
powdercoat
> place today.  The good news is that instead of the normal 3 week 
wait, I was
> told he would have these done next week.
> 
> So, SKB backs and some of the rails will be shipping next week.  
Flat rails
> guys expect invoices this weekend.
> 
> Why only 1/2 the SKB backs?  Because the metal shop missed the 
spec by
> 30/1000 inch width on 1/2 of them.  That doesn't sound like a lot 
on such a
> low tech item.  But, it was more than enough to keep the tops from 
fitting.
> Sigh....  So, I am waiting for that 1/2 to be re-done.  The good 
news is
> that all the tops are OK and I have plenty of 10U backs in 
the "good" half
> to fill all the orders.  The bad news is that ALL of the 5U tall 
backs were
> wrong.  I was promised they would have those replacements made 
right away.
> We'll see what "right away" means.
> 
> Why only 1/2 the flat rails.  Because Aaron's backordered 2500 of 
my screws
> that I use to keep the powdercoat off the threads.  I was told the
> backordered screws would be shipped today.  So next week, the 
remaining 1/2
> (of hopefully everything) goes in to powdercoat.  Given the 
unusually speedy
> response I am getting from the powdercoat place, looks like all 
flat rails
Show quoted textHide quoted text
> and SKB backs should be at their destinations before Turkey-day.
> 
> Larry

Re: good news

2002-11-03 by mate_stubb

>>>>
How about the panel orders? Any word on these?
<<<<

Panels are at the printers (finally!), and I'm hoping to hear back 
this evening or tomorrow when he expects to have them done.

Moe