Archive of the former Yahoo!Groups mailing list: MOTM
Subject: Update
From: "Paul Schreiber" <synth1@...>
Date: 2009-07-06
a) I will try to sort out the reversed cables tomorrow and will give an
update whenever I hear something. I have ~ 10 assembled modules to ship
Mon/Tues that I will 'borrow' correct power cables from kits previously made
up. But then I will stop doing that so I'll have kits to ship out this week
as well. Hopefully the new company can get me corrected cables by the end of
the week.
b) MOTM-190 panels arrived, MOTM-650 panels due July 20th.
c) I am out of the special bi-color LED used in the MOTM-320 and will look
for a replacement. Some kits will require soldering wires to the LED (the
older LED has red/black wires pre-soldered). I will have to call Lumex as it
looks from their website this particular LED/lens assembly is no longer
offered.
d) I'm still going to finish all of the kits up this week (even if I have to
wait for power cables) then go back to assembled modules. The assembled
backlog is still large and it will be many weeks until it gets to the < 20
level. Shane & I will be soldering for ~ 3 straight weeks this month and
that will probably be a 30% overall reduction. So, it will be into August to
get the backlog level substantially reduced.
e) remember: if you want an order shipped "with a tracking number", you need
to:
1) use EMS Express (both US and Foreign)
2) for ∗US ONLY∗ you can specify Fed-Ex Ground in the COMMENT field of the
order page, the cost is the ∗same∗ as Priority Mail. For people receiving
large/heavy/expensive shipments, I usually ship Fed-Ex Ground anyway.
Paul S.