Have been travelling this past week since Tuesday.

a) the new BTI pots for my Euro rack E340 SSAW VCO arrived. They look very
nice! I can now finish up the pc board layout/front panel design and get
that module moved into prototype/production. The delivery time was 10 weeks
which was not bad considering Bourns is 16 weeks.

b) I am ordering a batch of parts to finish up all the VCO kits. The
schedule is to ship assembled backlog until mid-May, then switch over to
shipping all the kit backlog. Since Jan 1st, I have reduced the number of
orders in the backlog by 58. I still have ~ 85 orders left to go. Probably
50 of these are strictly kit orders, so once I have all the kits ready they
will ship in 1 week. I will then have a reasonable backlog so after 3 years
or so I can have R&D time in large blocks. Looking at the cart, I've shipped
1069 orders since June 2006 with another 32 partially shipped orders.

c) I am ordering parts for the next 'DIY' module, the Yamaha Bandpass VCF.
The pots are Bourns but 100K linear and 10K linear. These will be in the
Extra Parts Kit with a few other things. It's a easy-to-build module (about
like a '420) in 1U width. I am setting aside time the last week of May to
lay the board out. It's already prototyped so the design is checked out.
More info later as I get it going.

I know things have gotten a bit "draggy" this spring due to real job travel.
But by June 1 I still think that the vast majority of orders will be shipped
out.

d) So far only 2 folks have entered the '730 contest. I'll declare the
winners (coin flip?) on Monday so if anyone wants to go at it this
weekend...........