Archive of the former Yahoo!Groups mailing list: MOTM
Subject: Update
From: "Paul Schreiber" <synth1@...>
Date: 2008-03-31
a) The last 3 VCO kits are shipping tomorrow!
b) this leaves 62 kits to ship to make a zero kit backlog. These will start
to ship the 3rd week of April. April 7-12 I will not be able to ship any
MOTM stuff, and email will be limited. It will take around ∗5 weeks∗ to kit
these and ship.
c) this coming week, I am working on the 520/521/730 prototype boards (in
production form-factors) and the production sheet metal drawings. I am also
releasing the MOTM-910 mult pcb to production build, so in ~ 3 weeks all
MOTM-910 orders can be shipped (and I will have PLENTY in stock for
immediate shipment).
d) From last week's response, I will make up 40ea of the 520/521, and
probably 40ea of the '730 as well for the first batch of shipments. The '730
may be ready several weeks before the other 2, it is a much simpler design.
The '102 will be a Sept/Oct release. That will be 4 new modules released in
6 months. Not to shabby.
Thanks to everyone that has stuck with me through all these radical changes,
and to those waiting for their assembled modules to arrive. I have not
forgotten about the frac VCO, either. There is just so much to do, and my
time is limited. I did reach the 700th ∗completed∗ order shipped since March
2006, so I am averaging 1 order a day, every day, shipped complete out the
door.
Paul S.