Archive of the former Yahoo!Groups mailing list: MOTM
Subject: Update
From: "Paul Schreiber" <synth1@...>
Date: 2007-07-07
The MOTM 'work week' is about over. Despite the 11 ∗inches∗ of rain (thankfully
today was just a drizzle) a lot got done. All of the outstanding MOTM-310 and
MOTM-510 kits are built up and will start shipping next week. I sweet-talked my
old tech Shane to put in some time soldering up all of MOTM-830 Mixer assembled
backlog, so that module is at least caught up. I built 22 Frac modules and those
are shipping tomorrow to Analog Haven. The one thing I didn't get to this week
but will this coming week is all of the power supply backlog shipped out.
About the Stooge cables: another person has agreed to handle this and so I will
forward him all of the previous requests. That deal is now between him and the
Hanebergs and I am no longer involved. I'll let him "announce" it when he wants
to.
The next three weeks will be more "real work" than MOTM. I am still on track to
ship over 100 modules in July and another 100 in August which would get me 100%
caught up. I think the single biggest chore is building about 15 assembled
MOTM-510s but that pcb goes pretty smoothly and shouldn't take that much total
time.
Paul S.