Archive of the former Yahoo!Groups mailing list: MOTM
Subject: Update
From: "Paul Schreiber" <synth1@...>
Date: 2005-07-19
I've been a bit under the weather lately, caught some sort of "summer cold" and
been dragging around last 4 days.
a) as soon as my tempcos arrive (mid next week) I can ship '485 kits. A word of
'warning': this is not a "smooth-as-butter" VCF. It's more like "loose change
and rocks in a blender" VCF. Especially in HP mode. I also need them for the
next batch of '310 kits (although I think I'm all caught up there).
b) I'm about caught up with all that I can ship. I have some '960s to ship this
week while the others are being made, and maybe 2-3 modules. The 2Pauls are
placing orders for panels and parts to stock up kits, enough to last 4-5 months.
Currently 2U blanks and rails are out. They should be back in stock Aug 15th.
Sheet metal shops use sundials to tell time :(
c) I have TONS of the longer PWR-30 power cable in stock. I can substitute these
for $5 for a kit/assembled module. You can also get them separately.
Off to guzzle Nyquil.
Paul S.