Archive of the former Yahoo!Groups mailing list: MOTM
Subject: MOTM-650 status
From: "Paul Schreiber" <synth1@...>
Date: 2005-05-24
Since several folks specifically asked.......
HW: I haven't had much time the last 2 months to work on it. The front panel
prototype had some issues with parts fitting properly/lining up. Nothing major,
just nudging stuff around.
The physical hardware is prototyped and debugged. I'm adding a small "safety"
RAM for future features, and I have to get that added and then the production pc
boards into CAD.
The HW (me) is the pacing item. And the only issue is devoting time. I am
getting to that point: I can pay off the bills (which the kits and CEMs provide
for) shortly and crank it out. Like Stooge Larry, I have to find time 'in the
cracks' of real work + family stuff.
As of right now, I'd guess that actual shipping is in August. That takes into
account:
a) front panel lead times
b) pcb lead times
c) SMT leadtime (making solder paste screen and programming the pick-and-place
machines)
d) testing/writing the manual
SW: I'd say 98% done. A few bugs left but nothing to panic over. Not the pacing
item (if Robert Rich can make 2 CDs with the code, then it's in pretty good
shape). Finishing up the Mac version of the SW Updater over MIDI (PC version
done).
I agree that this is a crucial, missing piece that many are waiting on. I will
have the CAD stuff done by the end of June (I will probably take vacation days
from work and hole up in the library, which is how I've done several modules
like the '480 pcb layout).
Paul S.