I presently am waiting on a 12 module system. I have one (Borg), soon to have my second module (Envelator). When I ordered, there were about 40 modules ahead of me. Since then, Grant has peeled off about 25 of them, while finishing my second module. When do I expect him to completely deliver the system? I don't know, but I am not worried. In telephone conversations with Grant, we have talked a lot about stuff - here is what he said; One thing to note - I paid in full. In order for Grant to sell these modules for the price he sells them at, he has to make a minmum run of faceplates, boards, etc. If you order a 6 module system and Grant is out of stock, Grant has to lay out the capital to have 10-20 faceplates made, 10-20 boards ordered, components stocked. By paying up front, it helps him to keep the production situation moving (instead of at a standstill waiting for parts). I have ordered several modules, but still, it is only perhaps 2 or 3 faceplates out of a total run of 10 or so per module. It is for this reason that he discontinued the controller. The end of the joystick controller was a result of lack of interest and the expense of making a minimum buy to stock the components (the volt meter being the most expensive piece). The 200 series Buchla run was about 400 modules, and Grant has already built, tested and sold 300 modules. (You can draw your own conclusions about what that means). I intend to own Wiard System. Who knows what will happen in the future? There will not be kits - it devalues the product. Presently, Wiard devices used are more valuable that new ones - because you don't have to wait. Historicaly, kits undermine the quality of the used market (is this factory built, or was this made by a novice?) Gotta go, but that's what he has told me. regards, gary chang --- In wiardgroup@y..., "skuehnl" <skuehnl@y...> wrote: > December is what I hear - someone with more insight might confirm/ > correct this > > SK > > --- In wiardgroup@y..., "Stengel, Kurt" <kstengel@c...> wrote: > > I'd think someone like him might get more use out of a Nord Lead > III...... > > > > By the way I am in the market for either a Technosaurus or a Wiard > modular. > > What is the wait time for Grant's stuff right now. Full blown 6 > unit > > system. Is it longer than 8 weeks? > > > > Kurt
Message
Re: joystick
2002-05-24 by gcmci
Attachments
- No local attachments were found for this message.