Yahoo Groups archive

MOTM

Index last updated: 2026-04-28 23:35 UTC

Thread

CG/CGX update

CG/CGX update

2008-06-07 by Paul Schreiber

The reason I went ahead and 'brought out' the MOTM-730 ahead of the CG/CGX
has to do with the CAD system upgrade I did about 2 years ago.

I use OrCAD schematic capture, I have been since *1986* when I was a beta 
tester :)
And, every MOTM module up to and including the MOTM-650 was designed in
OrCAD......for DOS!

However, I switched over (very late, at the "last and final offer we mean it 
REALLY"
letter) to the Windows version. I did not want to 'plunge it' with the 
complicated
CG/CGX so I decided to use the '730 as the guinea pig. The mistakes I made
had nothing to do with switching over the CAD, it was me being an idiot.

I now can navigate my way around the new Windows version (it is very 
different than
the DOS version) and now am ready to tackle the CGX first, then the CG 
electrical
CAD. Both schematics are 90% done as of today, tomorrow is going to be a
"CAD day" emphasis to correct the '730, send the 3 other boards in that set 
out for
production, and finish up the CGX schematic so Eric and I can review it 
(Eric is
the lead designer, I just try not to screw it up). Robert Rich is the 
'System Architect's
and I am the 'Head Peon'.

We will "sign off" next week on the schematics, I will then start the pc 
board CAD and
the mechanical CAD (with assistance from Tim 'Servo not MST3K' Parkhurst') 
around
Wednesday of next week. I want to ship all existing MOTM 2.0 orders before 
then.

The mechanical CAD is about 80% done for the CGX as well, there are 4 boards 
and
the LCD panel, but not as complicated as the '730 is. There is a breadboard 
up and running
so we have code that can do everything except the full USB librarian 
function (if anyone wants
a FREE CG/CGX set of modules and will write the librarian for *both* Mac and 
PC, email
me off-list).

My plans right now are to have a few production-ready CGX prototypes in 
mid-August.
I will then turn attention to the CG itself, which is mechanically done (I 
have 63 finished
panels sitting in the garage for....errr...a long time) but the pc board 
layout will be very
involved (probably a 6 or 8 layer board, hoping for 6).

I would say right now shipping the CG/CGX set will be around Nov 1st. The 
*current*
backlog has 95% of my available bandwidth until it is shipped out. I and 
planning 8
consecutive days in late June/early July for purging the backlog (my day job 
is in
'Summer Shutdown'). The sooner I can ship the backlog, the sooner the CG/CGX 
ship out.
Eric & I are confident of the overall design, it is not more of a 
CAD/manufacturing
issue and getting the final code ready to ship.

Paul S.

Re: [motm] CG/CGX update

2008-06-07 by Ti_

> I would say right now shipping the CG/CGX set will be
> around Nov 1st. 

Perfect! Now I know what this years "birthday present to myself" will be:)
~Tim

Move to quarantaine

This moves the raw source file on disk only. The archive index is not changed automatically, so you still need to run a manual refresh afterward.