a) rails are due in tomorrow. So, next week I will be able to ship out all
the rails on order. Note that these have wider "end openings" (0.250 versus
0.200) to accommodate metric mounting screws for cases (the *module* screws
are still 8-32). I am stressing out over these, I hope that they are OK and
I will be able to use this supplier in the future (the cost of shipping is
about what all the rails cost).
b) I have finished all my "real job' paperwork/activity and should start on
Aug 30th. I apologize for not being able to do much on MOTM the last 2
weeks, I have *really* stressed out over this (long!!) process. Starting
today I am back full-time on MOTM until the real job begins. It has been *18
years* since I have been in an "sea of cubes" environment although in my
division is more like a pond of cubes (there are only 4 of us). Still, the
get up-drive 21mi-lunch-drive home routine will take getting used to.
Will this impact MOTM? Sure it will. I have been working out of my home 8 of
the last 12 years. How much will it impact it? Hard to say, as overall my
business is way down anyway. After all the current stuff has shipped, I
suspect that in reality new order wait times will be the same for 2.0 stuff
and like 4-6 weeks for assembled. This job has very little travel (maybe 5
times a year) as opposed to my last job that was 60% travel.
I will still grind out the MOTM goods as long as people want them.
Paul S.
the rails on order. Note that these have wider "end openings" (0.250 versus
0.200) to accommodate metric mounting screws for cases (the *module* screws
are still 8-32). I am stressing out over these, I hope that they are OK and
I will be able to use this supplier in the future (the cost of shipping is
about what all the rails cost).
b) I have finished all my "real job' paperwork/activity and should start on
Aug 30th. I apologize for not being able to do much on MOTM the last 2
weeks, I have *really* stressed out over this (long!!) process. Starting
today I am back full-time on MOTM until the real job begins. It has been *18
years* since I have been in an "sea of cubes" environment although in my
division is more like a pond of cubes (there are only 4 of us). Still, the
get up-drive 21mi-lunch-drive home routine will take getting used to.
Will this impact MOTM? Sure it will. I have been working out of my home 8 of
the last 12 years. How much will it impact it? Hard to say, as overall my
business is way down anyway. After all the current stuff has shipped, I
suspect that in reality new order wait times will be the same for 2.0 stuff
and like 4-6 weeks for assembled. This job has very little travel (maybe 5
times a year) as opposed to my last job that was 60% travel.
I will still grind out the MOTM goods as long as people want them.