a) Monday is a national holiday in the US, so no shipping until Tuesday.
b) There will be much MOTM activity the next 2 weeks. Kits will begin to
ship on Thursday the 17th. It will probably take me 2 full weeks to ship
every last one of them. **IMPORTANT NOTE** I will be modifying the
instructions to cover the new BTI pots. Some kits will be as before, but
some will have *only* BTI pots in them (no Spectrol, no Bourns). Where the
blue Bourns pots once were, will be a BTI pot on a little pc board. You
solder the pot on one end, and the 3 wires to the other.
The BTI pots have shafts that are 0.197 shorter, but the knobs will still be
above the nuts. The 'feel' of these pots is very smooth, I personally think
they are an improvement.
In October, any surplus Spectrol and Bourns pots will be offered up for sale
REALLY CHEAP.
c) I am low on MOTM-19A rails, I will order more this week. I've been
putting this off due to cash flow, but I can't wait much longer. I'm going
to try a new vendor.
d) Info on the Euro modules (E340 and E350) is posted at www.muffwiggler.com
EuroRack forum
e) I will be able to ship assembled '410s and '300s the next 2 weeks, and
most likely MOTM-830s by the 20th. If you have a MOTM-480 on order, those
are about 5-6 weeks away.
f) every MOTM 2.0 order in backlog will ship this week. I'm also going to
ship all pending repairs this week.
Paul S.
b) There will be much MOTM activity the next 2 weeks. Kits will begin to
ship on Thursday the 17th. It will probably take me 2 full weeks to ship
every last one of them. **IMPORTANT NOTE** I will be modifying the
instructions to cover the new BTI pots. Some kits will be as before, but
some will have *only* BTI pots in them (no Spectrol, no Bourns). Where the
blue Bourns pots once were, will be a BTI pot on a little pc board. You
solder the pot on one end, and the 3 wires to the other.
The BTI pots have shafts that are 0.197 shorter, but the knobs will still be
above the nuts. The 'feel' of these pots is very smooth, I personally think
they are an improvement.
In October, any surplus Spectrol and Bourns pots will be offered up for sale
REALLY CHEAP.
c) I am low on MOTM-19A rails, I will order more this week. I've been
putting this off due to cash flow, but I can't wait much longer. I'm going
to try a new vendor.
d) Info on the Euro modules (E340 and E350) is posted at www.muffwiggler.com
EuroRack forum
e) I will be able to ship assembled '410s and '300s the next 2 weeks, and
most likely MOTM-830s by the 20th. If you have a MOTM-480 on order, those
are about 5-6 weeks away.
f) every MOTM 2.0 order in backlog will ship this week. I'm also going to
ship all pending repairs this week.
Paul S.