Yahoo Groups archive

MOTM

Index last updated: 2026-04-28 23:35 UTC

Message

Update

2008-06-23 by Paul Schreiber

a) By Friday, the Rev B MOTM-730 pc board should arrive, and towards the end 
of the month I will have the pre-production painted/screened sheet metal 
(just a couple of panels) to verify everything will stack up properly. I 
don't anticipate any issues, but you never know. If everything is OK, by the 
4th of July holiday (see below) I will "sign off" on the design and order 
production front panels and all the parts (I have the PICs and the 
displays/bezels already).

b) I am taking a MOTM break July 4 to July 12. Hey, Europe takes off most of 
August :)

c) I am almost 100% done with all existing MOTM 2.0 orders, I have like 4 
left and 3 of those are quite large. If you have an order less than #975 
that is a MOTM 2.0 order (not kits or modules, just parts) please email me 
and let me know (if your initials are KH I will email you about yours).

d) I will start shipping out the first batch of MOTM kits ~ July 17th. I 
won't be able to ship all of them until the end of August. I got all the pc 
boards in I ordered, I still have a lot of sheet metal due in and a few 
panels to order ('700s mostly). I will ping the vendor tomorrow for due 
dates. I still have a lot to do and this is still a hobby (nights & 
weekends) but things are looking better. I will have 9 consecutive days 
coming up when we are shut down for inventory/audits for the day job, I will 
be able to do MOTM most of that time. Some of that will be to get the 
prototype CGX pc boards & sheet metal on order. I also have not been able to 
get going on the '650 reordering, I need to do that AND get Analog Haven 40 
more Frac modules.

At least I'm not bored.

Paul S.

Attachments

Move to quarantaine

This moves the raw source file on disk only. The archive index is not changed automatically, so you still need to run a manual refresh afterward.