Paul-
Do you have an estimate on when the 2.0 order backlog will be eliminated?
Thanks,
mrmike
Do you have an estimate on when the 2.0 order backlog will be eliminated?
Thanks,
mrmike
--- In motm@yahoogroups.com, "Paul Schreiber" <synth1@...> wrote:
>
> a) The last 3 VCO kits are shipping tomorrow!
>
> b) this leaves 62 kits to ship to make a zero kit backlog. These
will start
> to ship the 3rd week of April. April 7-12 I will not be able to ship
any
> MOTM stuff, and email will be limited. It will take around *5 weeks*
to kit
> these and ship.
>
> c) this coming week, I am working on the 520/521/730 prototype
boards (in
> production form-factors) and the production sheet metal drawings. I
am also
> releasing the MOTM-910 mult pcb to production build, so in ~ 3 weeks
all
> MOTM-910 orders can be shipped (and I will have PLENTY in stock for
> immediate shipment).
>
> d) From last week's response, I will make up 40ea of the 520/521, and
> probably 40ea of the '730 as well for the first batch of shipments.
The '730
> may be ready several weeks before the other 2, it is a much simpler
design.
> The '102 will be a Sept/Oct release. That will be 4 new modules
released in
> 6 months. Not to shabby.
>
> Thanks to everyone that has stuck with me through all these radical
changes,
> and to those waiting for their assembled modules to arrive. I have not
> forgotten about the frac VCO, either. There is just so much to do,
and my
> time is limited. I did reach the 700th *completed* order shipped
since March
> 2006, so I am averaging 1 order a day, every day, shipped complete
out the
> door.
>
> Paul S.
>