a) The last 3 VCO kits are shipping tomorrow! b) this leaves 62 kits to ship to make a zero kit backlog. These will start to ship the 3rd week of April. April 7-12 I will not be able to ship any MOTM stuff, and email will be limited. It will take around *5 weeks* to kit these and ship. c) this coming week, I am working on the 520/521/730 prototype boards (in production form-factors) and the production sheet metal drawings. I am also releasing the MOTM-910 mult pcb to production build, so in ~ 3 weeks all MOTM-910 orders can be shipped (and I will have PLENTY in stock for immediate shipment). d) From last week's response, I will make up 40ea of the 520/521, and probably 40ea of the '730 as well for the first batch of shipments. The '730 may be ready several weeks before the other 2, it is a much simpler design. The '102 will be a Sept/Oct release. That will be 4 new modules released in 6 months. Not to shabby. Thanks to everyone that has stuck with me through all these radical changes, and to those waiting for their assembled modules to arrive. I have not forgotten about the frac VCO, either. There is just so much to do, and my time is limited. I did reach the 700th *completed* order shipped since March 2006, so I am averaging 1 order a day, every day, shipped complete out the door. Paul S.
Message
Update
2008-03-31 by Paul Schreiber
Attachments
- No local attachments were found for this message.