I have flown home (for the time being) while they run more tests on my Dad (he has a small but noticeable blood loss into his lower abdomen). Thanks for all the kind emails. The next 2 weeks I have a large portion dedicated to non-MOTM travel/work. I'll put in as much time as I can. I still need to get the MOTM-310 kits out, some will be shipping tomorrow. I am behind on power supplies, too. I guess I'm behind on everything :) I am getting 25 sets of all the MOTM-650 boards in today which will be enough for all existing orders and extras. The Cloud Generator demonstrator unit for the AH gathering should be operational by Monday. This isn't necessarily the final firmware, but all of the functions are there and everything is "tweakable" easily in the code in terms of overall effect. At least it has a 'real' front panel. The Frac VCO is about finished in pcb layout. I will have a FPE panel at the AH show for it, hopefully I will get the redesign/layout 99% correct so I can move these to production rapidly. Thanks to everyone that has been waiting all this time for their stuff. You *will* get everything you ordered, it may be October at this rate but rest assured I am here on my official day off from DDC putting in 12 MOTM hours. Paul S.
Message
Back up (sort of)
2007-08-03 by Paul Schreiber
Attachments
- No local attachments were found for this message.