a) email access this week will be limited
b) Indiana has received over 45,000 parts this week to kit up. It's going to
take a few weeks to get to the point where a bunch of modules can ship. I am
sending them the next set of modules that will go out. I am going back over the
list to be sure I have not skipped someone (so far, I did skip 1 person). If you
feel skipped, email me today if possible.
c) I received the proto MOTM-910 pc boards that use the 'stand-up' jacks. They
look snazzy. I will have these fabbed up. The front panel washers are slightly
smaller diameter than the current Switchcraft, I am trying to get them to send
me those instead. The MOTM-650's washers are slightly *larger*, some days I just
can't win :(
That's it for now, in a few weeks the MOTM pipeline will be filled up again. And
maybe a new AudioEngine module announcement :) We are looking at coding up some
simulations first and I have to look at some hardware issues. Meanwhile, all of
the 'hard to get' silicon for the Cloud Generator has *arrived* , my goal is by
Nov 1st to have a preliminary, full schematic finished (over 400 IC pins have to
be hooked up to each other, that is tedious).
Paul S.
b) Indiana has received over 45,000 parts this week to kit up. It's going to
take a few weeks to get to the point where a bunch of modules can ship. I am
sending them the next set of modules that will go out. I am going back over the
list to be sure I have not skipped someone (so far, I did skip 1 person). If you
feel skipped, email me today if possible.
c) I received the proto MOTM-910 pc boards that use the 'stand-up' jacks. They
look snazzy. I will have these fabbed up. The front panel washers are slightly
smaller diameter than the current Switchcraft, I am trying to get them to send
me those instead. The MOTM-650's washers are slightly *larger*, some days I just
can't win :(
That's it for now, in a few weeks the MOTM pipeline will be filled up again. And
maybe a new AudioEngine module announcement :) We are looking at coding up some
simulations first and I have to look at some hardware issues. Meanwhile, all of
the 'hard to get' silicon for the Cloud Generator has *arrived* , my goal is by
Nov 1st to have a preliminary, full schematic finished (over 400 IC pins have to
be hooked up to each other, that is tedious).
Paul S.