> c) Now that the initial Frac shipment is completed, attention turnsback to
> assembled module shipping. The non-prestuffed MOTM-480 kits will beready to go
> by Friday, too. I now have a LOT of stock for all the powersupply "stuff"
> (906s, 990s, etc) so those of you waiting for power supplies will getshipped
> this week. Indiana is about 100% "stocking levels" (about 100 kitssitting on
> the shelf). All that is a hassle are the Tempco resistors, stillabout 14 days
> away from getting those unless they ship early.So I read it this way: My nearly 3 year old points-only order of 310
and 950 will ship very very very soon. Do I have that right?
John Speth (whose patience is running out).