--- In motm@yahoogroups.com, "Paul Schreiber" <synth1@a...> wrote:
our racks in anticipation (e.g. the September Packrat). See
waiting.jpg in the photos section. - Dave
> I did talk to the sheet metal vendor I currently useHurry, please. Some of us have resorted to putting drawings in
> and hopefully can get the '650 rolling along.
>
> I do have a lead on a "local" (45mi away) vendor,
> I will talk to them this week.
our racks in anticipation (e.g. the September Packrat). See
waiting.jpg in the photos section. - Dave