I've been a bit under the weather lately, caught some sort of "summer cold" and been dragging around last 4 days. a) as soon as my tempcos arrive (mid next week) I can ship '485 kits. A word of 'warning': this is not a "smooth-as-butter" VCF. It's more like "loose change and rocks in a blender" VCF. Especially in HP mode. I also need them for the next batch of '310 kits (although I think I'm all caught up there). b) I'm about caught up with all that I can ship. I have some '960s to ship this week while the others are being made, and maybe 2-3 modules. The 2Pauls are placing orders for panels and parts to stock up kits, enough to last 4-5 months. Currently 2U blanks and rails are out. They should be back in stock Aug 15th. Sheet metal shops use sundials to tell time :( c) I have TONS of the longer PWR-30 power cable in stock. I can substitute these for $5 for a kit/assembled module. You can also get them separately. Off to guzzle Nyquil. Paul S.
Message
Update
2005-07-19 by Paul Schreiber
Attachments
- No local attachments were found for this message.