I've been traveling most of the last 2 weeks. I'm still catching up. I have lots
of CEM/SSM chips to ship as well as ~20 kits from my end. I'm still focusing
this month on assembled backlog. Taking some time off around 4th of July (no
real vacation in 3 years). Then I will focus on the '485 module shipping. The
'650/'730 R&D finishing up will just have to wait until the backlog is reduced.
On a positive note I think I can say that kit shipping is running pretty
smoothly now :)
Paul S.
of CEM/SSM chips to ship as well as ~20 kits from my end. I'm still focusing
this month on assembled backlog. Taking some time off around 4th of July (no
real vacation in 3 years). Then I will focus on the '485 module shipping. The
'650/'730 R&D finishing up will just have to wait until the backlog is reduced.
On a positive note I think I can say that kit shipping is running pretty
smoothly now :)
Paul S.