Panel news: Almost all the panels are shipped. I have just a couple of orders here waiting for response on hole size or an 822 PCB to go with it. Dave has three or so on his end that are still not shipped. So, if you are one of the few that have not received panels or happy mail, you can expect it soon. Cabinet news: Good news on the cabinet front (I hope). The cabinet maker called me today and reports serial number 001 prototype of the two- row slant cabinet is ready for inspection. I am going to look at it Friday. So, I plan to sort through all of that mail about who wants what cabinets and finally get back to people concerning firming things up. Cable news: Before the end of this month I will be taking orders for new cables. If you have a bad cable, it will be replaced free of charge. I checked the Rapco warrantee and it is for 1 year. The warrantee requests a return of the old cable. However, I think that is unreasonable. If they want some cables back for analysis of failure, I may ask for a couple back. If I do, any shipping dollars spent to return a cable will be credited on your new order. SKB pop-up support: I am still thinking about making a 2U rack panel for retrofit of MOTM-900 power supplies for SKB cases. Every time I do, I look at that stack of SKB backs in my garage and wonder who is really interested. If you are still interested in something like this, drop me a note. If there is sufficient interest, I may run these one time. Stooge Larry
Message
Stooge product news
2003-09-04 by J. Larry Hendry
Attachments
- No local attachments were found for this message.