1) Reduced emails in my Inbox from 1488 to only 615. Now that's progress!
2) The MOTM-380s are about done, waiting for a few resistors values from Digikey. Manual is done.
So, fully expect to begin shipping next week. I have made up 60 kits. That should cover most
everyone.
3) Spent the last 2 days on mainly tweaking the MOTM-490 Moog filter. I'm beating it to death,
because Moog ladders are inherently noisy and I want a quiet one. I'll keep you posted.
4) JH has finished up the design of the Fixed Filter Bank. Moe is doodling a panel (non-MOTM
traditional). It has 10 sections, all in parallel. It *does not* have individual outs because of
the noise/impedance issues. Do not be swayed by competitive filter banks: this one will *sound*
the best. I hope to post demos in about 10 days. I haven't worked up the cost yet, I need to get
a Bourns pot quote (it uses 10K log pots), but I bet the kit will be like $199-$209. There are
several "tricks" to keep the overall assembly out of the nightmare regions. Stay tuned. It's a
summer thing anyway, just filling the pipeline (and it's keeps me from getting bored to tears).
5) I have a big assembled delivery set for Monday that I am working on, along with the general
assembled backlog, currently 72 modules (I'm finishing up 8 MOTM-101s). Then I'm turning to kits.
This is the order in which I plan to replenish the kit stock:
800
310
101
410
300
440
and so on. Hang in there, I'm going 90MPH. Plus other distractions (daughter turns 16 in 11 days,
prayer takes up time).
Paul S.
2) The MOTM-380s are about done, waiting for a few resistors values from Digikey. Manual is done.
So, fully expect to begin shipping next week. I have made up 60 kits. That should cover most
everyone.
3) Spent the last 2 days on mainly tweaking the MOTM-490 Moog filter. I'm beating it to death,
because Moog ladders are inherently noisy and I want a quiet one. I'll keep you posted.
4) JH has finished up the design of the Fixed Filter Bank. Moe is doodling a panel (non-MOTM
traditional). It has 10 sections, all in parallel. It *does not* have individual outs because of
the noise/impedance issues. Do not be swayed by competitive filter banks: this one will *sound*
the best. I hope to post demos in about 10 days. I haven't worked up the cost yet, I need to get
a Bourns pot quote (it uses 10K log pots), but I bet the kit will be like $199-$209. There are
several "tricks" to keep the overall assembly out of the nightmare regions. Stay tuned. It's a
summer thing anyway, just filling the pipeline (and it's keeps me from getting bored to tears).
5) I have a big assembled delivery set for Monday that I am working on, along with the general
assembled backlog, currently 72 modules (I'm finishing up 8 MOTM-101s). Then I'm turning to kits.
This is the order in which I plan to replenish the kit stock:
800
310
101
410
300
440
and so on. Hang in there, I'm going 90MPH. Plus other distractions (daughter turns 16 in 11 days,
prayer takes up time).
Paul S.