Yahoo Groups archive

Emax

Index last updated: 2026-04-28 23:23 UTC

Message

Re: [emax] emax version 2 board SCSI upgrade in action...

2008-10-27 by mr julian

Jip Harrio wrote:

>Just curious what this "rework station" is. Is this something I could possibly find at Radio Shack?
>  
>
it looks like a gun, and has a hole in the end of its big fat tip to 
suck solder out as it melts... very handy, but expensive.

if you don't have one, the best option is to cut apart the socket with 
the knife you are using for the board rework.

just take it slow and careful, and don't overheat any of the PCB holes, 
and you'll be fine.

I recommend using desolder braid for cleaning the holes. those desolder 
pump things never do what I want... or maybe I only ever tried cheap 
crappy ones??


>As I was reviewing step 2 in the "Retro Instructions" I opened up my Emax and discovered that the trace between 11 and 12 instead of 12-13 on IC2 has already been cut. 
>
>Do you think that this will create a problem for me? And is there a recommended way to rejoin the trace?
>  
>
NOOOO!!!! don't "repair" previous mods!!!
:-)

my board has those too.

they are already done, and make your usint work as it's meant to, as is.

the new mods on top of the old mods make your board work as you want it to

>I too am planning to add the SCSI port from the back instead of adding a hard drive.
>
>I will be tracking your project in hopes staying safe with this project. I don't do this type of stuff often but I believe that I can do this project will some good reference and guidance.
>
>  
>
just remember - nothing is particularly hard, but you need to be slow 
and deliberate with what you do.

"measure twice, cut once"

also, try and be as non-static as you can be when handling the board - 
don't wear polyester and shuffle your feet on carpet.
:-)

if you have any static dissipative plastic (silver or pink - used in 
packing sensitive electronic stuff) use that when moving about with the PCB.




anyway - I ended up going and helping my mum change over her outlook 
express archives on her old computer to outlook on her new 
comnputer..... so that was a fine way to burn an evening, and I got no 
further with my mods.

I'm still hoping to have a report on my finished rev2 emax board by the 
end of the week.

Attachments

Move to quarantaine

This moves the raw source file on disk only. The archive index is not changed automatically, so you still need to run a manual refresh afterward.