I have CS-80 #1322 in my workshop for a full overhaul: chips
replacement, power supply refurbished, keyboard assembly dismantled and
cleaned, full calibration and test. If all goes well, should be finished
by the end of the month.
Crow
/**/
replacement, power supply refurbished, keyboard assembly dismantled and
cleaned, full calibration and test. If all goes well, should be finished
by the end of the month.
Crow
/**/
