Archive of the former Yahoo!Groups mailing list: MOTM
Subject: MOTM-800 redesign >> MOTM-810
From: "Paul Schreiber" <synth1@...>
Date: 2008-09-02
After I ship the 18 or so MOTM-800 kits on order, and the 12 assembled ones,
I will be out of 1M log pots. The problem is (and always has been), that
these are never a stock item and so I have to order them as a custom. Which
is 16-18 WEEKS delivery and a 600pc minimum order. Sometimes they will
accept a 400pc order, but the last time I bought these was in Nov of 2005
and they made me take 600.
So, if after tomorrow calling and begging, if I can't get them to sell me
like 150 (which will last me at least 1 year) I am going to retire the
current design and switch over to an SMT version of the MOTM-1800 Frac EG
which ∗internally∗ has both CV control of all parameters and the
looping/burst stuff.
In order to be "form, fit and function" with the existing MOTM-800, these
fancy features will not be implemented. From the "outside" the function will
be exactly like the existing MOTM-800.
I can add all the fancy stuff, but that would go to a 2U wide module
(MOTM-810) to add the 2 extra jacks and the 4 extra pots (plus switch,
pushbutton and [gasp] LED).
You would figure a 1M log pot is not that 'rare' in the real world, but
distribution mostly stock is linear 1K, 5K, 10K and 50K. Even 100K linear
can be an issue to locate.
I will keep you posted on the Great Bourns Pot Hunt of 2008. The 100K linear
pots for all the other modules is not an issue, I have over 400 of those
sitting here :)
Paul S.
reason #488 why stuff takes so long to ship