Paul-
Do you have an estimate on when the 2.0 order backlog will be eliminated?
Thanks,
mrmike
--- In motm@yahoogroups.com, "Paul Schreiber" <synth1@...> wrote:
>
> a) The last 3 VCO kits are shipping tomorrow!
>
> b) this leaves 62 kits to ship to make a zero kit backlog. These
will start
> to ship the 3rd week of April. April 7-12 I will not be able to ship
any
> MOTM stuff, and email will be limited. It will take around ∗5 weeks∗
to kit
> these and ship.
>
> c) this coming week, I am working on the 520/521/730 prototype
boards (in
> production form-factors) and the production sheet metal drawings. I
am also
> releasing the MOTM-910 mult pcb to production build, so in ~ 3 weeks
all
> MOTM-910 orders can be shipped (and I will have PLENTY in stock for
> immediate shipment).
>
> d) From last week's response, I will make up 40ea of the 520/521, and
> probably 40ea of the '730 as well for the first batch of shipments.
The '730
> may be ready several weeks before the other 2, it is a much simpler
design.
> The '102 will be a Sept/Oct release. That will be 4 new modules
released in
> 6 months. Not to shabby.
>
> Thanks to everyone that has stuck with me through all these radical
changes,
> and to those waiting for their assembled modules to arrive. I have not
> forgotten about the frac VCO, either. There is just so much to do,
and my
> time is limited. I did reach the 700th ∗completed∗ order shipped
since March
> 2006, so I am averaging 1 order a day, every day, shipped complete
out the
> door.
>
> Paul S.
>