Archive of the former Yahoo!Groups mailing list: MOTM
Subject: Update - panels / cables and metal
From: "J. Larry Hendry" <jlarryh@...>
Date: 2004-08-05
Well, the list is quite. So, I'll stick in the occasional Stooge update.
Panels: These have been at the final stage of the process, the printer for
some time. He should be getting along real well I hope. I'll drop him a
note soon and inquire as to the anticipated ship date. They all ship to Moe
for quality inspection and then we start dividing up and shipping. Those
with drilling services will ship a little later as it takes a while to put
in the approximately 300~350 holes and get them all just right.
Cables: I told you guys we would be ordering cables in July. That is when
I planned to be shipping panels in late June. But, I do plan to start that
right away. I am working with my solid color cable vendor to increase the
number of cable end choices. I should have more samples yet this week.
Metal - I am almost completely out of flat rails. I have some here, but
they are already spoken for to ship with some panel orders. I am getting
low on stock of a couple of sizes of brackets. That is after I account for
what will ship with panels. All of that stuff is in stock and ready to go
as soon as we get panels. I ordered 750 pieces of metal today to replace
diminishing stock. Other than flat rails, the only thing I am in danger of
running out of before the new stock arrives are 3-pot short and 1-pot
brackets. Cross your fingers and hope the metal shop does not increase our
price.
Cabinets kits. I plan to ship 5 cabinets next week. So, even though it
seems like they are taking forever, the process is indeed still working,
albeit at a snails pace. After I get those out the door, I plan to go back
through the original list of those who expressed interest and see after all
this time if you are still interested. I saved all your e-mails. So, I
still know what the pecking order is.
Stooge Larry